Bachmann Branchline 37-365 13t Steel Tippler Wagons Taunton Concrete Weathered.
A pack of three BR design 13-ton sand tippler wagons lettered for working from the BR concrete plant at Taunton.
The Taunton site produced pre-cast concrete components to build station platforms, fencing, lineside huts and cable trunking. These wagons were used to bring in sand for the production of the concrete and to deliver the cast parts to work sites.